Geotechnical Survey Vessel

Geotechnical Survey Vessel

Lingjack supplied drilling shipset hydraulic system and all winches onboard with 60ton knuckle boom crane for geotechnical survey vessel (2025)

Other Projects

Lingjack Supplied 3 shipset of AHTW 150T and shark jaw & tow pin for 63meters PSV vessel (2023~2024)
Lingjack supplied 2 spread mooring pull in system and 1 turret pull in and riser winch for FPSO, 1 mooring system for FSU and 1 fender handling winch for FLNG. (2023~2024)
Back to Top